Managing portfolio’s risk for improving quality in a project oriented manufacture

Authors

  • Farshad Shirazi * PMP and Project Planning Expert, OEID, Iran

DOI:

https://doi.org/10.52547/ijie.1.1.48

DOR:

https://dorl.net/dor/20.1001.1.27831906.2021.1.1.3.5

Keywords:

Quality management, risk management, project oriented manufacture, portfolio

Abstract

Iran is a developing country and there are many different infrastructure projects in hand. Some of the manufacturers that produce equipment for infrastructure projects as for oil, gas and energy projects should manage their efforts based on production management and project management practices; these kind of manufactures are known as project oriented manufacture. It is very important to manage and control manufacturing equipment project with the consideration of the constraints (time, cost, scope and quality). During the project’s lifecycle many risks take place, either positive or negative that should be controlled not to have a negative effect on quality of the project. With considering this concept, in this paper we will discuss a framework how to manage risks to eliminate negative effects on the quality of the project.

Downloads

Download data is not yet available.

References

Adam, S., Suzzi, D., Radeke, C., & Khinast, J. G. (2011). An integrated Quality by Design (QbD) approach towards design space definition of a blending unit operation by discrete element method (DEM) simulation. European Journal of Pharmaceutical Sciences, 42(1–2), 106–115. doi: https://doi.org/10.1016/j.ejps.2010.10.013

Analysis techniques for system reliability – Procedures for failure mode and effects analysis (FMEA). International Standard IEC 608122006.

Artto, K., Heinonen, R., Arenius, M., Kovanen, V., and Nyberg, T. (1998), Global Project Business and the Dynamics of Change, Technology Development Centre Finland – TEKES, Helsinki, Finland, 147 p.

Camuffo, A., Furlan, A. and Rettore, E. (2007), “Risk sharing in supplier relations: an agency model for the Italian air-conditioning industry”, Strategic Management Journal, Vol. 28 No. 12, pp. 1257-66. doi: https://doi.org/10.1002/smj.635

Daniell, M. (2000). World of risk: Next generation strategy for a volatile era. Singapore: Wiley.

Fang, C., & Marle, F. (2012). A simulation-based risk network model for decision support in project risk management. Decision Support Systems, 52(3), 635-644. doi: https://doi.org/10.1016/j.dss.2011.10.021

Gareis R. Happy Projects! Vienna: Manz; 2005.

Guebitz, B., Schnedl, H., & Khinast, J. G. (2012). A risk management ontology for Quality-by-Design based on a new development approach according GAMP 5.0. Expert Systems with Applications, 39(8), 7291-7301. doi: https://doi.org/10.1016/j.eswa.2012.01.089

Huemann, M. (2010). Considering Human Resource Management when developing a project-oriented company: Case study of a telecommunication company. International Journal of Project Management, 28(4), 361-369. doi: https://doi.org/10.1016/j.ijproman.2010.02.008

Huemann, M., Keegan, A., & Turner, J. R. (2007). Human resource management in the project-oriented company: A review. International Journal of Project Management, 25(3), 315-323. doi: https://doi.org/10.1016/j.ijproman.2006.10.001

Kerzner, H, 2005. Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Willey.

Khattab, A., Anchor, J., & Davies, E. (2007). Managerial perceptions of political risk in international projects. International Journal of Project Management, 25, 734–743. doi: https://doi.org/10.1016/j.ijproman.2007.03.006

Loo, S. C., Abdul-Rahman, H., & Wang, C. (2013). Managing External Risks for International Architectural, Engineering, and Construction (AEC) Firms Operating in Gulf Cooperation Council (GCC) States. Project Management Journal, 44(5), 70–88. doi: https://doi.org/10.1002/pmj.21365

Lotfi, F. H., Najafi, S. E., & Nozari, H. (Eds.). (2017). Data Envelopment Analysis and Effective Performance Assessment. IGI Global. doi: http://doi.org/10.4018/978-1-5225-0596-9

Meredith, J. R., Mantel, S.J., 2005. Project Management: A Managerial Approach. Willey.

Miller, D. (2002), Successful change leader: what makes them? What do they do that is different?, Journal of Change Management, 2 (4), pp. 359-368. doi: https://doi.org/10.1080/714042515

Morris, P.W.G., The Management of Projects, second ed. Thomas Telford, London, 1997

Project Management Body of Knowledge (PMBOK), Project Management Institute, 2013.

Project Management Body of Knowledge (PMBOK), Project Management Institute, 2000.

Project Management Institute, 2009. Practice Standard for Project Risk Management

Project Management Institute, 2013. The Standard for Portfolio Management

Shi, Q. (2011), “Rethinking the implementation of project management: a value adding path map approach”, International Journal of Project Management, 29 (3), pp. 295-302. doi: https://doi.org/10.1016/j.ijproman.2010.03.007

Steffey, R. W., & Anantatmula, V. S. (2011). International Projects Proposal Analysis: Risk Assessment Using Radial Maps. Project Management Journal, 42(3), 62–74. doi: https://doi.org/10.1002/pmj.20237

Sun, J., Matsui, M., & Yin, Y. (2012). Supplier risk management: An economic model of P-chart considered due-date and quality risks. International Journal of Production Economics, 139(1), 58-64. doi: https://doi.org/10.1016/j.ijpe.2012.03.004

Tanık, M. (2010), "Improving “order handling” process by using QFD and FMEA methodologies: a case study", International Journal of Quality & Reliability Management, Vol. 27 No. 4, pp. 404-423. https://doi.org/10.1108/02656711011035110

Teller, J., & Kock, A. (2013). An empirical investigation on how portfolio risk management influences project portfolio success. International Journal of Project Management, 31(6), 817-829. doi: https://doi.org/10.1016/j.ijproman.2012.11.012

Turner, J.R., The Handbook of Project-based Management, 2nd ed., McGraw-Hill, (1999)

Turner, R., Huemann, M., & Keegan, A. (2008). Human resource management in the project-oriented organization: Employee well-being and ethical treatment. International Journal of Project Management, 26(5), 577-585. doi: https://doi.org/10.1016/j.ijproman.2008.05.005

Van Donselaar, K., Kopczak, L.R., and Wouters, M. (2001), The use of advance demand information in a project-based supply chain, European Journal of Operational Research 130: 519-538. doi: https://doi.org/10.1016/S0377-2217(99)00411-7

Downloads

Published

2021-03-28

How to Cite

Shirazi, F. (2021). Managing portfolio’s risk for improving quality in a project oriented manufacture. International Journal of Innovation in Engineering, 1(1), 55–63. https://doi.org/10.52547/ijie.1.1.48

Issue

Section

Original Research