Provide a model for managing claims regarding the PMBOK standard

Authors

  • Farshad Shirazi * Project Planning Expert, Consultant of RIECO, Iran

DOI:

https://doi.org/10.52547/ijie.1.2.63

DOR:

https://dorl.net/dor/20.1001.1.27831906.2021.1.2.5.9

Keywords:

Change, Claim, PMBOK, Contracts

Abstract

Iran is very rich in oil and gas, which is why the Iran government is investing billions of dollars every year in oil and gas facilities to improve the country. The oil and gas refinery construction industry are very complex and involves multidisciplinary contributors. In this environment, many changes and claims appear. Changes and claims are commonly considered negative events, and thus, should be kept away from the project. With considering this concept, this paper presents the results of a study of the types and causes of project claims in the Persian Gulf Star Gas Condensate Refinery project in Bandar Abbas. The data were analyzed and the consequences of this analysis along with advice on how to reduce/prevent claims in construction are then presented.

Downloads

Download data is not yet available.

References

• Aliahmadi, A., Sadeghi, M. E., Nozari, H., Jafari-Eskandari, M., & Najafi, S. E. (2015). Studying key factors to creating competitive advantage in science Park. In Proceedings of the Ninth International Conference on Management Science and Engineering Management (pp. 977-987). Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-47241-5_82

• Essam K. Zaneldin, 2006. Construction claims in United Arab Emirates. International journal of project management 24, pp. 453-459. https://doi.org/10.1016/j.ijproman.2006.02.006

• Kazemipoor, H., Shirazi, F., 2009. Study the factors of scope creep in power plant projects according to PMBOK, International project management conference, Iran, Tehran.

• Kumaraswamy, M. M., & Yogeswaran, K. (2003). Substantiation and assessment of claims for extensions of time. International Journal of Project Management, 21(1), 27-38. https://doi.org/10.1016/S0263-7863(01)00052-7

• Nozari, H., Najafi, S. E., Jafari-Eskandari, M., & Aliahmadi, A. (2016). Providing a model for virtual project management with an emphasis on IT projects. In Project Management: Concepts, Methodologies, Tools, and Applications (pp. 476-496). IGI Global. http://doi:10.4018/978-1-4666-9688-4.ch003

• Reich, B. H., & Wee, S. Y. (2006). Searching for Knowledge in the PMBOK® Guide. Project Management Journal, 37(2), 11-26.

• Rosenberer, P., & Tick, J. (2021). Agile Enhancement of Critical PMBoK v6 Processes. The Journal of Modern Project Management, 9(1).

• Rowe, G., Wright, G., The Delphi technique as a forecasting tool: issues and analysis. International journal of forecasting 15(4), pp. 353-375. https://doi.org/10.1016/S0169-2070(99)00018-7

• Rustamova, S. (2021). Application of PMI PMBOK standard in the development of the Construction cost management projects plan. International journal of trends in business administration, 11(1).

• Shirazi, F. (2021). Managing portfolio’s risk for improving quality in a project oriented manufacture. International Journal of Innovation in Engineering, 1(1), 55–63. https://doi.org/10.52547/ijie.1.1.48

• Stackpole, C. S. (2013). A User's Manual to the PMBOK Guide. John Wiley & Sons.

• Yang, Q. (2021). Understanding of an ‘Enlightened Planning’Approach in Project Risk Management. Journal of Management Science & Engineering research, 4(1). https://doi.org/10.30564/jmser.v4i1.2854

Downloads

Published

2021-07-06

How to Cite

Shirazi, F. (2021). Provide a model for managing claims regarding the PMBOK standard. International Journal of Innovation in Engineering, 1(2), 63–72. https://doi.org/10.52547/ijie.1.2.63

Issue

Section

Original Research